LOCATION

Sinter Plant Shutdown 2020

CLIENT

Bluescope Steel

JOB DESCRIPTION

DBC rope access technicians and rope access trade technicians (boilermakers, advanced scaffolders, blasters, fitters, NDT technicians, trade assistants) completed over ​1,100 man risk hours ​for the shutdown across 6 different work scopes and working back to back shifts.

SERVICES PROVIDED

Rope access trades and NDT in a confined spaces working back to back 12 hour shifts / Installing engineered supports: cut penetrations, to weld and bolt new hatches in the roof of the RDD / Remove and replace 4 internal structural braces 11m long sections, 165mm diameter, schedule 80 pipe / Completed NDT - MPI on all welds Rope access NDT - UT inspection RDD steel duct and turning vanes with over 500 readings / Ducting was thickness mapped and ladder rungs replaced / Shockbar gusset and baffle replacements completed for Precipitator Technologies / Blasting and coating scope in the Slabcaster working with Specialised Industrial Maintenance.

TESTIMONIAL

DBC and their teams did a great job. They turned up well prepared with plenty of gear. We had a late start but they still completed the task in the time allocated. Two of our guys spent a lot of time with the afternoon shift guys and were very impressed with their professionalism.

Bluescope Steel Slabmaking Slabcaster Maintenance