LOCATION

LAKE MEDLOW DAM, BLUE MOUNTAINS, NEW SOUTH WALES

CLIENT

ABERGELDIE COMPLEX INFRASTRUCTURE/ WATER NSW

JOB DESCRIPTION

Medlow Bath Dam, built in 1907 and located in a sensitive natural environment required. DBC engineered, supplied and installed a Husik access system to enable maintenance to the heritage dam wall. The access was installed over water in a remote location by multi-skilled rope access advanced scaffolders. The access was modified to accomodate changing water levels without impacting the structure or surrounding environment. Minimising the use of costly plant, cranage and excessive scaffold.

SERVICES PROVIDED

ENGINEERED HUSIK TEMPORARY PLATFORM / ACCESS FOR HERITAGE DAM WALL / HUSIK INSTALLED IN REMOTE LOCATION OVER WATER / HUSIK ROPE ACCESS INTEGRATED WITH ADVANCED SCAFFOLD

TESTIMONIAL

Just a quick thank you to you and your crew for your assistance with the various projects that have been undertaken by DBC in the past few months up in the Blue Mountains. The manner in which the site staff conduct themselves and attention to detail in the safety and installation department always provides for a quality finished product. Abergeldie, our client WNSW and other stake holders are always left impressed. We look forward to working with DBC on future projects.

ABERGELDIE COMPLEX INFRASTRUCTURE, PROJECT MANAGER, WATER NSW

CONTACT US

CONNECT
WITH
US

CONTACT US

CONNECT WITH US