LOCATION

LAKE MEDLOW DAM, BLUE MOUNTAINS, NEW SOUTH WALES

CLIENT

ABERGELDIE COMPLEX INFRASTRUCTURE / WATER NSW

JOB DESCRIPTION

Lake Medlow Dam, built in 1907, replacement of the permanent access platform at the centre of the heritage dam wall. The work undertaken in a remote, sensitive natural environment, above a water catchment on one side and a sheer 20m drop on the other. Utilising a lightweight engineered HUSIK access system to provide anchorage, installed by rope access advanced scaffolders and multiskilled rope access tradespeople to both remove and install the platform. DBC completed the installation with a minimal environmental footprint, without plant, cranage or the need for extensive scaffolding.

SERVICES PROVIDED

ENGINEERED HUSIK ACCESS SYSTEM FOR RIGGING / ANCHORAGE AND EDGE PROTECTION / INSTALLATION OF ACCESS USING MULTI-SKILLED ROPE ACCESS ADVANCED SCAFFOLDERS / MOBILE WELDING AND CUTTING WITH ROPE ACCESS TRADES BOILERMAKERS / CARRIED IN MODULAR COMPONENTS AND INSTALLED NEW PLATFORM / MANAGED WORK IN REMOTE HERITAGE STRUCTURE, OVER WATER CATCHMENT IN SENSITIVE NATURAL ENVIRONMENT

TESTIMONIAL

Just a quick thank you to you and your crew for your assistance with the various projects that have been undertaken by DBC in the past few months up in the Blue Mountains. The manner in which the site staff conduct themselves and attention to detail in the safety and installation department always provides for a quality finished product. Abergeldie, our client WNSW and other stake holders are always left impressed. We look forward to working with DBC on future projects.

ABERGELDIE COMPLEX INFRASTRUCTURE, PROJECT MANAGER, WATER NSW